Bad Cannstatt:
US Army Hospital

Disciplines

  • Buildings & Architecture
  • Urban Infrastructure & Utilities

Companies

Dorsch International Consultants

Client

US Army Division, Europe (EUD), Frankfurt/Main

Duration

From 1988 to 1990

Project Activities

  • Preparatory measures:
    • Topographical survey
    • Subsoil investigation
    • Preliminary design
    • Cost estimate
  • Design:
    • Buildings (architecture)
    • Civil works and traffic facilities
    • External facilities
    • Mechanical-electrical equipment for heating, ventilation, air-conditioning and sanitary installations as well as medical technology and electrical engineering
    • Preparation of tender documents

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

DORSCH CONSULT was entrusted with the conversion of a ward block (4 storeys) and an ancillary block under preservation order as well as with the construction of new staircases and lifts.

The completed hospital comprises the following functions (in accordance with DIN 13080):

  • General nursing
  • Operating theatre
  • Maternity ward
  • Intensive care
  • Laboratories
  • Emergency admission
  • Supply and disposal facilities