Ramstein Airbase:
Construction of New Headquarters Building for the Contingency Response Group

Disciplines

  • Buildings & Architecture

Companies

Dorsch International Consultants

Client

Staatsbauamt Kaiserslautern

Duration

From 2000 to 2002

Project Activities

  • Design Development
  • Approval Design
  • Detailed Design
  • Preparation of Tender Documents
  • Assistance in Award of Contract
  • Site Supervision
  • Facility Management and Documentation

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

The aim of the project was to design a new building to accommodate the planning facilities required for military emergency operations.
The "central planning and coordination facility" embraces planning, deployment and signals monitoring rooms (SCIF), a passage for emergency vehicles as well as store and assembly rooms and offices for the military command. The new building is designed with particular attention to functional, environmental and security aspects.
The project includes the planning of the outdoor facilities and open spaces as well as anti-terror protection. The building has two storeys with an open central hall covering both storeys for the planning and deployment
area in the middle. Around this central planning area are grouped additional conference, administration and utility rooms - distributed over the two storeys.
The passage for emergency vehicles which is required in the ground floor represents a special feature. On account of the prevailing subsoil conditions (former swamp land), resulting in reduced load-bearing capacity, it was necessary to strengthen the building’s foundations by means of piles.
The outdoor facilities are in accordance with the configuration plans which have already been  developed by Ramstein Air Base - including hardstands for approx. 100 cars and associated access.