Duration
From 2001 to 2005Project Activities
- Concept Design
- Approval Design
- Final Design
- Preparation of Award
- Participation in Award
- Project Supervision
Contact
Dorsch International Consultants GmbH
München (Headquarters)
80687 München
Germany
Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de
Description
Design task is the alteration of former office areas to a travel agency of Fraport AG, the airport operator, and the new design of a luggage deposit and the installation of a HC-elevator.
The total project implementation will be accomplished in individual building phases in close dependence to operational and functional processes.Design and implementation of the project is characterized by requirements of building fire protection and the implementation of clear and transparent architecture.
Design is based upon § 53 HBO ”Special Use Building Systems and Rooms”.